Charging readiness · pre-delivery screen

Will the forklift charger work at your site?

A three-phase outlet somewhere in the building is not the same as a confirmed charging point. Check the broad supply match, location, electrician confirmation and time available to charge.

01 · Machine and supply
02 · Operating window
h/day

This tool matches the broad supply class disclosed for each charger. It cannot inspect circuit capacity, protection, voltage, connector, isolation, cable route, ventilation or installation compliance.

Catch a power mismatch before delivery day.

You get a readiness status and a practical next-action list.

Important boundary

This is a workflow check, not electrical advice

10A is not 15A

The EFL181’s listed Australian setup uses a dedicated 15A single-phase outlet. A common 10A general-purpose outlet is not treated as interchangeable.

“Three-phase” is incomplete

Voltage, current, connector, protection, isolation and charger placement must all match the supplied charger and installation requirements.

Duty still matters

An electrically compatible charger can still be the wrong operational setup if daily energy use exceeds the battery and available charging window.

Photograph the outlet before delivery day.

Send the charging check with the final model enquiry, then have a licensed electrician confirm the installation.